This project will rehabilitate 12.3 miles of Georgia Southern short line freight track between MP 73.65 and MP 85.95. This includes replacing a metal culvert, repairing 32 steel H-piles on the bridge located at MP 84.0, and improving safety on two community crossings between Metter and Register, GA to permit safe, 10mph train speeds with daytime operations.