Smart and Resilient Energy Systems supports companies and organisations developing space-enabled studies and pilot services to improve electricity-grid operations, infrastructure protection and resilience.
Additional dates are now listed for the underlying BASS tender, but your APQ deadline remains November 27, 2026 at 13:00 CET; the November 30, 2027 tender closing date does not replace it. If you are applying from Denmark, check the linked open-call page for the funding-authorisation conditions and timeline that take precedence. The page also clarifies that Full Proposals undergo Tender Evaluation Board review, clarification and negotiations before an agreement is signed.
Funder: European Space Agency
Due Dates: November 27, 2026 (APQ) | June 27, 2027 (Slovenian pre-authorised Full Proposals)
Funding Amounts: Up to 50–80% of activity costs; Slovenian pre-authorisation: €400,000 total, up to €200,000 per proof-of-concept study
Summary: Supports space-enabled proof-of-concept studies and pilot services that improve electricity-grid operations, infrastructure protection and resilience.
Key Information: National Delegation funding authorisation is required for Full Proposals, with a conditional pre-authorisation exemption for Slovenian companies.
The European Space Agency (ESA) runs this non-competitive call through its ACCESS Business Applications and Space Solutions (BASS) programme. Developed with ELES, Slovenia’s combined transmission and distribution system operator, it supports proof-of-concept studies and pilot projects addressing practical electricity-network needs. Priorities include critical infrastructure protection, climate resilience and emergency preparedness.
Projects should develop commercially sustainable, pre-operational services rather than pure academic research or basic scientific data exploration. Relevant capabilities include satellite Earth Observation, communications, navigation and satellite-enhanced forecasting, combined with AI, analytics and digital twins. The call covers forecasting and grid operations, Dynamic Thermal Rating enhancement, and asset intelligence and situational awareness. Applicants may address ELES use cases or related requirements identified with other customers, with both routes considered equally in evaluation.